This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

日产无码久久久久久精品| 视频一区二区三区sm重味| 老校长不戴套玩新婚老师| 久爱WWW人成免费网站下载| 无码人妻精品一区二区三区| 老人玩小处雌女视频| 富婆被大肉楱征服小说| 大又大粗又爽又黄少妇毛片| 精品香蕉99久久久久网站| 国产精品久久欧美久久一区| 亚洲欧洲日产国码无码久久99| 久久久婷婷综合五月色麻豆| 草莓视频app黄| 《与上司出轨的人妻》| 国产天美传媒一起又看流星雨| 色噜噜狠狠一区二区三区| 不戴胸罩的瑜伽教练| 男朋友舌头伸到下面很肿胀| 国内最真实的xxxx人伦| 艳阳门无删照片1400还有视频| 性饥渴寡妇肉乱免费视频 | 被夫の上司に犯中文字幕| 98国产精品综合一区二区三区 | 久久精品国产一区二区电影| 女人被狂躁免费看30分钟| 精品一区| 久久精品人妻一区二区三区| 尤物视频网站| 高h猛烈失禁潮喷a片在线观看| 潘金莲被武松高潮八次小说| 欧美性猛交xxxx乱大交| 久久这里只有精品| 京东一热本色道久久爱| 亚洲av成人精品一区二区三区| 御书房双乳晃动干柴烈| 无遮掩60分钟从头啪到尾| 国产精品xxxx国产喷水| 色欲色香天天天综合www| 制服 中文 人妻 字幕| 国产精品国产精品国产专区不卡| 一性一交一伦一片a片庆|